Infrastructure Development
1. Piperacks
- A comprehensive pipe-rack system links all oil-based establishments to the liquid bulk terminal.


2. Pipeline Interchange
- Located at the POIC Liquid Bulk Terminal.
- Complete with boiler and compress air facility.
- Pipelines are provided from the interchange to the berth..
3. Roads
- POIC Lahad Datu is complete with 50m wide dual-carriage access roads which tread the entire 1,557 acre site in Phase 1, 2 & 3A.


4. Electricity
- Double circuit underground cabling system.
- Electricity supply up to 50MW.
5. Water
- Capacity 3 Million Gallons (11.35 Mil ltr/13,000cu.mt) of Permastore Tanls.
- Quality up to World Health Organization standards.

6. Sewerage & Hazardous Waste Treatment
Centralised sewerage treatment plant is provided to treat domestic waste which complies with the following criteria:
- Effluent standard: Department of Environment (DOE) Standard COD 200mg/L, BOD5 (20C) 50mg/L. The effluent standard B Should not contain any chemical, acids or hazardous material
- Underground sewer pipes of 225mm diameter (FRP) are laid along the internal roads in POIC.
7. Telecommunications Infrastructures
- Telekom Malaysia Berhad has installed & commissioned telecommunication infrastructure within POIC Lahad Datu. State of the art voice, video, data and internet services are available within the entire POIC Lahad Datu.
8. Drains
- Constructed by reinforced concrete and steel bars.
POIC Lahad Datu Terminal Facilities
1. Liquid Bulk Terminal (Located in Phase 1)
20M Draft
- 500m from shoreline.
- 2 berths to accommodate vessels up to 100,000DWT.
10M to 12M Draft
- 60M-70M from shoreline.
- 5 loading platforms, 600m berthing length.
- Can accommodate vessels/barges up to 20,000 DWT.


2. Dry Bulk Terminal (Located in Phase 2)
14M Draft
- 2 outer berths to accommodate vessels up to 30,000 DWT.
12M Draft
- 2 outer berths to accommodate vessels up to 10,000 DWT.
- Cargo handling equipment.
- 2 high speed Kalmar quay-cranes.
- Conveyer belt system to handle bulk cargo up to 1,000 tonner/hour.
3. Container Terminal (Phase 3)
- Target completion in Q4 2018